LIGHTING

某某照明电子

文章
  • 文章
Search

news

新闻动态

Details

Detailed Design of Guangzhou Port Phase II Grain Terminal

Client: Guangzhou Port (Top 10 Port in the World), China

Background:

  • CPM was commissioned detailed design of a new grain terminal at Guangzhou Port (annual capacity of 10 million tons with 6 deepsea berths and 1.1 million tons storage). 

1ae1aa896a5f0fe5c00722f5c0f6c61.png

What it delivered:

  • Technical feasibility

  • Functional planning and cargo handling design

  • Detailed design covering terminal layout design, wharf and jetty design, terminal and storage design, and other detailed design and plans. 

  • Equipment selection

  • Invitation to Bid (ITB) package



Contact Us

89 Yanling Road, Tianhe District

Guangzhou, P.R.China, 510000

Tel : +86-13539923110

Email: okwyz@hotmail.com

Follow us

seo seo